2011-2013 FUMC Fellowship Hall

Demolition and Renovation

Click Here for the Plan and a Printable history of the renovation with pictures



Demolition of Old Fellowship Hall

Pictures Taken August 30, 2011

 



Back of Fellowship Hall Looking Toward the Scout Hut



 


Kitchen Looking South



 


Kitchen Looking Northeast
 

 



Inside Fellowship Hall Looking East

Ceiling Inside Fellowship Hall

Inside Fellowship Hall Looking West



Renovation of Fellowship Hall

Pictures Taken Inside April 13, 2012

 



Floor Removed from Old Kitchen

 

Scaffolding in Hall

New Ceiling Joists in Hall
Picture taken from top of Scaffold

 

Entry Arch in Hall

Scaffolding in Chapel

Foam Insulation in Pantry

 


Pictures Taken Outside April 13, 2012
 



Outside of Old Kitchen
 


Pictures Taken Outside May 1, 2012



 



Looking at Back of Fellowship Hall
 

 


Preparing for Construction of New Kitchen

 



Construction of New Storage Room on Left



Another View of New Kitchen Area

 

Another View  ̶  Looking Toward Scout Hut




Pictures Taken June 1, 2012
 



Inside Looking at Main Entrance
 



Inside Looking toward Serving Area
 

New Kitchen Addition

 

 

New Storage Area on SE side of Fellowship Hall

 

 

More Detail of New Kitchen Addition


 

Another View  ̶  Looking Toward Back of Fellowship Hall
 


Pictures Taken August 22, 2012

 



Inside Fellowship Hall Looking West

 

Inside Fellowship Hall Looking East toward Serving Area

 

North Entrance and Audio/Visual Control Room

Building Plans

Chapel

Chapel



Walk-in Refrigerator and Freezer in Kitchen



New Kitchen Equipment

 

Looking West toward Back of Kitchen

 

Methodist Symbol above Top Window at Back of Kitchen


Pictures Taken September 17, 2012



Ramp to New Storage Area and to New Kitchen



Looking West toward Back of Kitchen

 

 

Inside Fellowship Hall Looking East toward Serving Area

 



Chapel



Chapel

 



Vice President and Forman of Joytech Construction



Building Plans

 

 

Serving Area (Remodeled Old Kitchen Area)

 

 

New Kitchen showing Preparation Area, Convection Oven, and Range

 


Fellowship Hall Tower Under Construction


Pictures Taken on March 19, 2013

 

 

 

 

 

 

 